System Size: 114.24 kW
Installation Type: Roof Mount
Installation Date: January 2017
Location: Hurlock, MD
Annual Environmental Offset: 106.8 tons of CO2, or 2,485 trees
Warwick Fulfillment, a provider of direct-to-consumer and business-to-business fulfillment services, installed a 114.24 kW solar system at their facility in Hurlock, MD. The roof-mount system consists of 336 solar panels.
With an expected production of 142,038 kWh (Kilowatt-Hours) of electricity, the solar system’s production will offset roughly 106.8 tons of CO2 and 225.2 barrels of oil each year. “Warwick Fulfillment Solutions has long been concerned with “green” business solutions,” said Chris Mushinsky of Warwick Fulfillment Solutions. “The move to solar power is another step in a continuous process of finding the balance between daily business requirements/operation and environmentally responsible processes.”
The environment isn’t the only thing benefiting from the first few months of solar production. Warwick Fulfillment is already reaping the financial benefits. “We have already, in just a few months, experienced a 40% reduction in the cost of our energy bills,” said Mushinsky.
“The [Paradise Energy Solutions] team was experienced in the actual physical installation - which occurred in a timely, efficient manner,” said Mushinsky. “And, our contacts at Paradise Energy were able to assist us when it came to working with state authorities to gain proper business benefits from the installation of the solar panels. In addition, Paradise Energy'ss installation process was totally non-invasive to our roofing structure.”
This free resource will give you an honest, up-to-date comprehensive look at all things solar, saving you a ton of research time.
Download our solar guide to be on your way to a successful solar investment.